ROI Calculator
Enter your firm's numbers and see the projected annual impact of Civilnex. Pre-populated with conservative, real-world industry defaults — adjust to match your reality.
Assumptions: 40% bid preparation time reduction (conservative floor of documented 40–60% range). 10-point win rate improvement is a conservative estimate based on platform performance. Estimator loaded cost $50/hr; PE loaded cost $100/hr.
Annual Cost of Non-Winning Bids
$198K
Fully loaded labor invested in bids that generate no revenue
Annual Hours Reclaimed
1,536 hrs
Based on conservative 40% time reduction — equivalent to ~1 full-time estimator
Additional Bid Capacity
+38 bids/yr
Same team — more bids produced with reclaimed time
Projected Additional Revenue
Up to $1.7M
Combined capacity gain + 10-pt win rate improvement (conservative estimate)
Based on historical specialty geotechnical project data. Conservative mid-range estimates — adjust to your firm's actual project mix for the most accurate projection.
| System Type | Typical Range | Default Used | Notes |
|---|---|---|---|
| Helical Pile (Commercial) | $30,000 – $50,000 | $40,000 | Residential repair jobs excluded — Civilnex targets commercial contractors |
| Micropile | $40,000 – $70,000+ | $60,000 | Higher ticket due to specialized equipment and materials |
| Stone Column (Ground Improvement) | $50,000 – $200,000+ | $200,000 | Wide range; large infrastructure projects can reach $500K–$1M+ |
| Mixed Portfolio | Varies | $85,000 | Blended default — replace with your firm's weighted average |